Categories: Bathrooms, Renovation, Tiling

Bathroom renovation


This house had moisture spots on the bedroom walls. The cause turned out to be the bathtub in the bathroom.

We therefore removed the bathtub and existing tiles, raised the faucet, and completely leveled the floor and walls. After leveling, we applied three layers of insulation with reinforcement mesh.

The walls were then finished with large slabs of natural stone that match the design of the old stones.

This customer opted for a 2 cm shower tray instead of a new bathtub. We also installed a new shower system and a new shower screen, as well as a new door and new baseboards. Finally, everything was repainted.